Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBroughshane Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Broughshane Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Broughshane Wind Farm (Wind , Active) Location in the UK : N.Ireland, BT43 7HR Type of installation: Wind on/offshore: on Turbines :11 Capacity : 22.7 MW Approx Date of 1st power generation: March 2018
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Elginny Hill/Coreen Hill Tullymore Road Broughshane BT43 7HR Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rathsherry 21 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4558 / AA710
District:
|
Applicant: |
Energia (formerly Brookfield Renewable Energy Group)
Application :
G/2011/0162/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
20.7 |
Site Address: |
lands in the townland of Rathsherry, east of Tullymore Road and south and north of Longmore Road, Broughshane, Ballymena
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
132735 / 132735
|
Development Status: |
Operational
|
Application Submitted: |
4/11/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/15/2016
|
|
|
Generator Live |
2/15/2018
|
This Record Last Updated: |
2/23/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
3/26/2020 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Broughshane Wind Farm
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R01231NQNI
|
Capacity: |
22733.56
|
Status: |
Live
|
Accreditation Date: |
4/11/2011
|
|
|
Commission Date: |
2/18/2018
|
|
|
Applicant: |
Antrim Wind Energy Limited
|
Applicant Address: |
16 Eden Terrace
STRABANE
BT82 8EN
Northern Ireland
|
Address: |
Elginny Hill/Coreen Hill
Tullymore Road
Broughshane
BT43 7HR
Northern Ireland
|
Site Name: |
Broughshane Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01285NWNI
|
Capacity: |
22733.56
|
Status: |
Live
|
Accreditation Date: |
4/11/2011
|
|
|
Commission Date: |
2/18/2018
|
|
|
Applicant: |
Antrim Wind Energy Limited
|
Applicant Address: |
16 Eden Terrace
STRABANE
BT82 8EN
Northern Ireland
|
Address: |
Elginny Hill/Coreen Hill
Tullymore Road
Broughshane
BT43 7HR
Northern Ireland
|
|
Assumptions: Capacity: 22733.56kW 22.73356 MW, Thus over the month Capacity * 720 hours per month = 16368.1632 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2448 | 10.77% | Issued | 01/03/2018 | | | 1450 | 6.38% | Issued | 01/02/2018 | | | 133 | 0.59% | Issued |
|
Capacity: 50.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/2/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|